Product Details
Place of Origin: China
Brand Name: GCE
Certification: CE/RoHS/SGS/MSDS
Model Number: 4U
Payment & Shipping Terms
Minimum Order Quantity: 2
Price: negotiable
Packaging Details: Corrugated Carton
Delivery Time: 15-20 days
Supply Ability: 1000 sets/month
Product Name: |
624V60A DC BMS |
Model Number: |
4U (RBMS07-S20-160A624V) |
Module Strings: |
15S*13 |
Battery Type: |
Lifepo4, NCM, LTO, Lithium Ion |
Communication Protocol: |
RS485 TCP/IP CAN DYR CONTACT |
Application: |
BESS UPS SOLAR BATTERY PACK |
Warranty: |
3 Years |
Product Dimension: |
482*180*500mm |
Product Name: |
624V60A DC BMS |
Model Number: |
4U (RBMS07-S20-160A624V) |
Module Strings: |
15S*13 |
Battery Type: |
Lifepo4, NCM, LTO, Lithium Ion |
Communication Protocol: |
RS485 TCP/IP CAN DYR CONTACT |
Application: |
BESS UPS SOLAR BATTERY PACK |
Warranty: |
3 Years |
Product Dimension: |
482*180*500mm |
GCE 624V 160A High Voltage BMS Communicate with Rs485 protocol For Lifepo4 Battery Storage
Model no.: RBMS07S20-160A624V | Contents |
Number of moudel strings: 195S (15S*13) 1set Master BMS, 13sets 15S Slave BMU 13sets 15S Wire Harness * 4U standard 19inch case * Efficient, stable and reliable |
|
12S-24S BMU(Slave)12S-24S BMU has 8pcs of temperature sensors, Fan voltage 48V(17S-24S 12V), voltage detection range 0-5V,12V power
supply,consumption less 20mA, CAN2.0 B communication |
|
Wire harness-Signal acquisition wire18 Pin+20Pin wire, standard length is 600mm,900mm,1200mmtempreture sensor wire: standard length is 600mm,900mm,1200mm
Fan wire: 600mm |
|
Wire harness-communication wireCommunication wire is connecting from the master BMS to each BMU with a cascade connection, the last port is for terminal resistance
|
|
Communication protocol: Rs485, CAN, LAN
|
W482*H180*D500mm |
The company comes with the company's
communication protocol, but also according to customer needs to adapt to PCS of different manufacturers.
GCE BMS is a valuable ally for BMS design, particularly when applied to exploring and addressing design challenges within hardware development, prototyping, and testing. With an accurate lithium-ion cell model in play, the model of the BMS architecture is the executable specification recognized as the virtual prototype. In addition, simulation permits painless investigation of variants of BMS oversight functions against different battery and environmental operation scenarios. Implementation issues can be discovered and investigated very early, which allows performance and functional safety improvements to be verified before implementation on the real hardware prototype. This reduces development time and helps ensure that the first hardware prototype will be robust. In addition, many authentication tests, including worst case scenarios, can be conducted of the BMS and battery pack when exercised in physically realistic embedded system applications.
Jojoling Weng
Whatsapp me: +86 15570747076
Wechat: +86 15570747076
Email: wenglin@hngce.com
Linkedin: https://www.linkedin.com/in/jojoling-weng-74b47b220/
Facebook: https://www.facebook.com/GCEjojoling/
Youtube: https://www.youtube.com/channel/UCm5HlGPOAZyF8nIkAVhN73Q