Product Details
Place of Origin: China
Brand Name: GCE
Certification: TCT/RoHS/SGS/MSDS
Model Number: 5U
Payment & Shipping Terms
Minimum Order Quantity: 2
Price: negotiable with wenglin@hngce.com
Packaging Details: Corrugated Carton
Delivery Time: 15-20 days
Supply Ability: 1000 sets/month
Features: |
DC&AC Dual Power Supply |
Material: |
Iron |
Model Number: |
5U, 13-24S |
Battery Type: |
LFP NMC LTO, LFP NMC LTO |
Communication Protocol: |
Rs485, CAN, LAN |
Application: |
Solar Energy Storage Systems, BESS UPS EV |
Packaging: |
Corrugated Carton, Bundles, Pallets, Wooden Box |
Carton Size: |
770*560*240mm |
Features: |
DC&AC Dual Power Supply |
Material: |
Iron |
Model Number: |
5U, 13-24S |
Battery Type: |
LFP NMC LTO, LFP NMC LTO |
Communication Protocol: |
Rs485, CAN, LAN |
Application: |
Solar Energy Storage Systems, BESS UPS EV |
Packaging: |
Corrugated Carton, Bundles, Pallets, Wooden Box |
Carton Size: |
770*560*240mm |
225S 720V DC 630A LFP NMC Contactor Relay Solution Master Slave 5U BMS 10K
1. Includes:
1set Master BMS,
15sets 15S Slave BMU
15sets 15S Wire Harness
2.Wire harness includes:
Voltage&Temperature acquisition wire,
BMU External Communication Wire with Shenji Port,
Power wire for the Fan.
3.Modular design, configurable, scalable
Flexible combination of multiple energy storage unit can be expanded to a larger energy storage system, the maximum can support 272 (lead-carbon battery 400) battery series.
4.Rich communication interface
Multiple RS485, CAN, Ethernet, dry contact input and output interfaces, support for most of the market with PCS, monitoring server communication.
5.Customization
Send me your detail specficaton needs, we wil according it to arrange mass production
BMS System Structure
Precautions For Use
1) There is high voltage inside the energy storage system. It is strictly forbidden to open the case for disassembly, assembly and maintenance without the company or its authorized technicians, otherwise the electric shock will be released and the warranty rights will be lost.
2) It is strictly prohibited for any wire or connector in the BMS to overlap the positive and negative poles of the battery, otherwise there may be a danger of short circuit and damage the circuit board.
3) it is strictly prohibited to be close to the water source or fire source to avoid the fire of the battery due to short circuit or overheating.
4)after the secondary protection is triggered, the circuit breaker is controlled by BMS. After disconnection, the system must be powered off to eliminate the fault, and can be powered on and started again after an interval of at least 1 minute, otherwise it may cause damage to the shunt coil of the circuit breaker because it is too late to emit heat.
5) If you need to cold start the UPS/PCS from the battery, you must first close the battery switch on the UPS/PCS side before starting the battery. If you start the battery first, and then close the battery switch on the UPS/PCS side, since the DC side of the UPS/PCS side generally has a large capacitance, the instantaneous capacitance is equivalent to a short circuit. At this time, the current charged by the battery to the capacitor will be much higher than that of the RBMS machine. The rated value of the contactor is very easy to cause ablation and adhesion of the contactor's contact. The contact resistance of the contactor's contact increases and heats up or the contact cannot be disconnected, which triggers the secondary protection